Nail the second strip of underfelt to the rafters in the same manner as the first, with the lower nails positioned about 50mm (inches) from the edge so that it secures both this strip and the previously laid one. Repeat this sequence with further strips of felt up to the top of the roof. Underlay is generally held in place by the tile battens , but where nailing is require nails should be extra large head felt nails of 3. Roof underfelt and battens Once the old roof covering has been removed and any required repairs made to the roof timbers, or, for a new roof , the new roof. Roofing - fixing battens to a roof for tiles and slates explained.
With the roofing felt fitted (see fixing roofing felt ), the next job is to fix the roofing battens.
Roof construction including felt , battens and tiling with either marley or redland tiles. The tiler is very busy and can only felt and batten at the time the trusses . How to start tiling a roof – New 1F under slaters or under tile felt stretched across clean . How to combat roofing prices by felting your roof , battening the felt and roof tiling yourself. In this video we look at the installation of felt and battens to a roof in line with current Irish Building. How to tile a roof - If you would prefer to READ how to tile a roof and see more help, please visit this link.
Have you ever wondered why you need counter battens in your roof build up, or questioned whether they are worth the extra cost? Roof tiles, redland tiles, marley tiles ?
They are all tricky to understand so this video shows you the basic roof. How to slate a roof and lay slates, easy gauge and batten guage explaine and how to set out the first row of slates called the eaves or starter course. Roofing battens are nailed into the rafters (or roof joists or trusses) and provide support for the roof tiles or slates. Interlocking concrete tiles are perhaps the most cost effective of the roof. The felt roof underlay is secured by nailing direct to the rafters and then held by the battens which will be fitted to secure the tiles or slates too.
Roof work - felt , battens and tiles Is This Quote Fair? Roofing felt that is laid underneath the battens forms a dust and water vapour barrier. It prevents the warm air within the roof from coming into . We supply trade quality DIY and home improvement products . After: concrete tiles remove fixed new roofing felt , battens and . Add felt and re- batten front roof of terraced house. I am looking for some advice and some rough estimates.
Typically a Scottish practice, the roofing underlay is laid directly over a series of. Ailing roofs need not spell disaster for a renovation project. Traditional Roofing Magazine - Top Mistakes Made When Installing New. Roof battens are thin strips of material that may be made of woo plastic or metal.
The roof covering is one of the most important parts of your property and a well- constructed new roof will.
New roof with Tyvek felt and red John Brash battens. Everything you need to know about lightweight roof tiles and the. For a steel roofing made with Tapco roof shingles, felt , batten and fully . Tegral also offer dedicated training for roofing contractors at our.
Set out the roof battens by calculating the gauge using the. Ponding behind battens causes damage to a large portion of the felt underlayment. You can see by the lap on the underlayment, the roof was double felted. Timber roofing battens The new, stricter rules are designed to clarify . It must be used under the battens , and rolled out in horizontal bands lapped progressively.
If you are laying underlay on a curved roof it will be impossible to lay it in. Felt tacks, or batten nails turned over, are only temporary fixings until the . NSC Weathering roofing slate grey natural slate - 4x 2x 5-7mm, m 55. Water should rarely if ever touch your felt paper and have to flow around battens to get off the roof.
Roofing underlays are typically positioned over the roofing structure, i. Transport into the roof drainage system any moisture in the batten. At a low pitch, some elements of the roof system are working at the limit of their capabilities, meaning. The felt should be lapped 150mm horizontally and 150mm vertically, carried .